High Park – The Mountain is currently in the concept stage, with planning permission, funding, and approvals still required. To become production-ready and approved, it must secure planning permission, complete funding arrangements, and meet all regulatory conditions. A small church proposed by the Radosavlevici family is part of the concept and may be sited where the family wishes, but at present it exists without permission or approval — it can only proceed once the family formally requests it, secures planning permission, and the proposal is approved through the proper process.

Directory

1 · Where the chapel sits

The proposed site is the open plaza at the top of the mountain (+120 m AOD), directly beside the 360° panoramic London skyline viewing saucer. Placing the chapel here gives it: unobstructed skyline views on three sides, natural arrival flow from summit visitors (the busiest point of the park), calm separation from the 7 subterranean levels below (all remain untouched), and the symbolic highest-point position for worship, remembrance and family ceremonies.

2 · Concept design — "The Chapel of the Summit"

Elevation (side view)

Mountain +120 m · summit plaza · chapel 9 m tall with spire

Floor plan (12 m × 9 m)

✝ Entrance from plaza · capacity ≈ 60 seats

Design language

3 · Planning check — required before it can be built

A new-build chapel is a full planning application: in the UK, planning permission is required for new buildings and external works irrespective of denomination — the "ecclesiastical exemption" only removes the need for listed building consent for certain denominations and applies to existing places of worship, not new construction. Building regulations approval is also required before any building work.

RequirementWho grants itStatus
Full planning permission (new place of worship, F1 use class)Local planning authority (London borough)❌ Not submitted
Building regulations approval (structural, fire, access)Local authority building control / approved inspector❌ Not submitted
Design & access statement, heritage & townscape assessmentSubmitted with the application❌ Not started
Structural engineering of the artificial mountain summit slabIndependent structural engineer❌ Not started
Fire strategy & evacuation from +120 m levelFire engineer + approving authority❌ Not started
Equality Act access statement (step-free, wheelchair)Included in application❌ Not started
Funding commitment for constructionInvestors / family / grants❌ Not committed
Formal request by the Radosavlevici family to proceedThe family❌ Not yet made

4 · Master project plan — concept to production-ready

PhaseKey activitiesGate to pass
1 · Concept (now)Summit chapel concept design, siting study, this plan & status promptFamily formally requests the chapel
2 · FeasibilityStructural survey of summit slab, architect appointment, cost plan, access studyFeasibility report accepted
3 · Pre-applicationPre-app advice from the borough, community consultation, design revisionsPre-app feedback incorporated
4 · Planning submissionFull planning application, D&A statement, townscape/heritage assessmentsPlanning permission granted
5 · Funding & approvalsComplete funding arrangements, building regs approval, fire strategy sign-offAll regulatory conditions met
6 · ConstructionBuild chapel to approved drawings, inspectionsPractical completion certificate
7 · OpeningConsecration/dedication, public quiet-space openingProduction-ready & approved

Key figures

+120mAOD · summit plaza position
12×9mChapel footprint · 9 m to spire
60Oak seats · step-free access
7Phases concept → approved

Investor & Partner Inquiry

If you are interested in supporting or investing in the High Park – The Mountain project, including the Summit Chapel, please share your details below. Your inquiry will be sent directly to the project team.

International Human Rights Law & Ethics
Dignity · Equality · Safety · Peace · Opportunity · For All People · For Future Generations
Ownership: Ervin Remus Radosavlevici — Radosavlevici family. Ownership unchanged.
Concept design indicative only; dimensions, costs and safety calculations require independent professional review. No transfer, dilution, or alteration of ownership is authorized.
Official website: highpark.highpark.app · Status page: hidepark.highpark.app · Copyright © 2026 Ervin Remus Radosavlevici. All rights reserved.